Listed building consent for air conditioning: cost, time and how to apply

Listed building consent costs nothing to apply for, but a listed home also needs planning permission for an outdoor unit, and a thin application is the quickest way to a refusal. This guide takes you through the process in order: checking the list entry, getting early advice, what to submit and who prepares it, fees, timescales, conditions, appeals and what happens if work goes ahead first.

to apply for listed building consent £0

Surveyor measuring a window reveal with a laser measure in a panelled Georgian room with shutters and a moulded cornice
to apply for listed building consent
£0
planning fee from 1 April 2026
£548
to decide, once valid
8 weeks
to start work after consent
3 years
On this page15 sections

What you're applying for

Listed building consent is the authorisation section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires before anyone alters a listed building 'in any manner which would affect its character as a building of special architectural or historic interest'.

  • Does air conditioning need it? Historic England's view is that air conditioning is likely to, and heat pumps fixed to a building normally do. Our guide to air conditioning in a listed building explains why.
  • Planning permission too: listed homes and their gardens have no permitted development right for heat pumps.
  • Two decisions, one submission: Historic England says they should be considered at the same time, and there's a combined householder planning and listed building consent form for England.
  • In practice you make one submission with one set of drawings.
  • Consent is for the works, not for you. It stays with the property, and whoever carries out the works must follow it and its conditions.

The process, step by step

  1. Find the list entry

    Search the National Heritage List for England by address or map. Note the seven-figure list entry number, the grade, the date first listed and any parts the entry excludes. Remember the whole building, inside and out, is listed, however short the description.

  2. Survey and options

    Before anything is drawn, work out where the outdoor unit, pipes and indoor units could go and which positions do least harm. Record the alternatives and why you rejected them: Historic England says it should be clear why less harmful options were discounted.

  3. Get early advice

    Historic England recommends talking to the council's conservation officer early. Councils offer an informal view, sometimes free, or paid pre-application advice. In Bath, for example, a conservation officer site visit for listed building energy works costs £76 from 1 April 2026.

  4. Prepare the documents

    Scaled drawings, product and sound data, photos, a design and access statement, a statement of significance and a method statement. The checklist below lists each one.

  5. Submit both applications

    Apply online through the Planning Portal or direct to the council. Listed building consent is free; the planning fee is £548 for a house or a single flat from 1 April 2026. The council checks the application is valid before the clock starts.

  6. Decision and conditions

    The council has 8 weeks from a valid application. Consent usually comes with conditions, some of which must be cleared before work starts.

  7. Install as approved

    Start within 3 years unless the consent says otherwise, follow the approved drawings exactly, and keep the decision notices with your deeds for when you sell.

What to submit for an air conditioning or heat pump install

National requirements plus what Historic England and councils ask for with plant on listed buildings. Your council's local validation list may add items.

  • The application form and the right ownership certificate: Certificate A if you own the freehold outright, Certificate B with notice served on other owners, such as a freeholder
  • A location plan at 1:1250 or 1:2500 on up-to-date mapping, with the property edged in red
  • A block or site plan at 1:200 or 1:500 showing boundaries, neighbours and the unit position
  • Existing and proposed elevations of every affected wall at 1:50 or 1:100, with written dimensions and a scale bar
  • Existing and proposed floor plans showing each indoor unit, the pipe, cable and condensate routes, and every wall opening
  • Details of how the outdoor unit and any screen are fixed, and how they could be removed later
  • Product data: dimensions, colour, sound power level, and efficiency figures
  • Photos of each elevation and room affected, with the proposed positions marked; a photomontage helps for sensitive positions
  • A design and access statement, which every listed building consent application needs
  • A statement of the building's significance and the effect of the works, in proportion to the job
  • A method statement and schedule of works: fixings, core holes, pipe routes, making good and protecting finishes
  • The case for the system: the heating benefit, the simple cooling measures already in place and why rooms still overheat
  • Noise evidence: the maker's data and an MCS 020 calculation, plus an acoustician's report if your council asks for one

Who usually prepares each document

You can write and submit an application yourself. Most people use specialists for some parts.

DocumentUsually prepared byWhat we provide
Forms and ownership certificateYou, or an agent you appointHelp completing the form; we can submit as your agent if you ask
Location and block plansWhoever draws the scheme, on licensed Ordnance Survey mappingIncluded in the design pack
Plans, elevations, fixing and pipe route drawingsThe installer's designer, an architect or a surveyorIncluded in the design pack, from our measured survey
Product, sound and efficiency dataThe installer, from the manufacturerIncluded, with our MCS 020 calculation
Design and access statementYou or your agent, with technical inputThe technical text: positions, fixings, removal, routes
Statement of significanceYou, where the council accepts it, or a heritage consultantNot ours to write; we can introduce independent consultants
Acoustic report, where asked forAn acoustician (IOA or ANC member)Not ours to write; we supply the unit data and positions they need

Historic England's Advice Note 18 says the information should be proportionate to the impact, and asks for a statement by an appropriately qualified specialist for major cases. Ask the conservation officer what yours needs.

What it costs

The fees paid to the council, and the costs you may meet around them. Read October 2026.

ItemCostNotes
Listed building consent applicationNo feeNo current fee in England, on the Planning Portal schedule
Householder planning permission£548From 1 April 2026, for one house. A single flat is also £548
Certificate of Lawfulness of Proposed WorksNo feeRarely suits a full install; see below
Online submissionService charge may applyThe Planning Portal adds a charge to some applications; it shows at checkout
Pre-application adviceSet by each councilFree informal views at some councils; Bath's conservation officer visit is £76
Acoustician's reportAbout £400 to £600Only where the council asks for one
Appeal against a refusalNo feeFor listed building consent appeals, on gov.uk
Our design packFrom £795Taken off your installation if you go ahead with us

Conditions, and clearing them

Most consents come with conditions. Historic England's Advice Note 16 says they may require a schedule of works, a method statement, or details of new services. For air conditioning that often means the exact unit model and colour, the screen design, fixing details or a noise limit at the neighbour's window.

Read the decision notice carefully. Some conditions must be cleared before any work starts, by sending the council the details it asked for and waiting for written approval. Failing to comply with a listed building consent condition is itself an offence under section 9(2), so we don't start until every pre-start condition has been discharged.

The certificate of lawfulness route

Since 6 April 2014 you can ask the council for a Certificate of Lawfulness of Proposed Works under section 26H of the 1990 Act. It confirms that works would not affect the building's special interest, so need no consent.

  • The terms: it's free, it lasts 10 years, and it can't be applied for after the work is done.
  • It doesn't remove the need for planning permission.
  • Rarely succeeds for a new install, because Historic England's starting point is that air conditioning is likely to affect special interest.
  • Worth trying in narrow cases: a like-for-like replacement on an existing consented position and pipe route.
  • Or an install entirely within a part of the building the list entry excludes.
  • Or a modern extension with no special interest where every pipe runs through modern fabric.

Why applications stall or fail

From council validation guidance and published heritage advice.

ProblemWhat to do instead
Drawings not to a stated scale, unlabelled, or not matching each otherNumber and title every drawing, state the scale at a paper size, and check plans and elevations agree
No red line on the location planEdge the whole property in red on current Ordnance Survey mapping
No design and access statementInclude one: every listed building consent application needs it
Unit dimensions or pipe routes missingShow the unit's size on every drawing and every pipe, inside and out
No noise information where the council asks for itInclude the maker's data and calculation, and an acoustic report if your council requires one
A heritage statement written after the design was fixedStart from the building's significance, then design around it
Citing a neighbour's unit as precedentMake the case on your own building; councils say precedent isn't a deciding factor

Bath's council, with about 5,000 listed buildings in the city, says objections arise 'Where plans and drawings are not of a professional standard, lack detail or are inaccurate'.

Where our design pack helps

The council decides from drawings and technical detail. Our design pack covers that technical side from one measured survey:

  • Location and block plans, and existing and proposed plans and elevations
  • Fixing and pipe route details, and the equipment schedule
  • The maker's sound data and our MCS 020 calculation
  • Photos with the positions marked, and the technical text for the design and access statement
  • Help with the form, and one round of changes after the officer's comments
  • We are air conditioning installers, not architects, heritage consultants or acousticians.
  • We don't write the statement of significance or an acoustic report, but we tell you at the start if your council will want them and can introduce independent specialists.
  • The council decides, and the fee is payable whether or not consent is granted. Our design pack terms set out the rest.

The design pack fee

From £795, fixed in writing before anything starts. It can be more for a larger home, a Grade I or II* building, or a council that asks for more. It's paid in full when you accept, and taken off your installation if you accept our install quote within 6 months.

  • A design pack for a consent application

    Drawings, specification and sound data; taken off the install if you go ahead

    from£795