Air conditioning in Letchworth and Welwyn Garden City: the estate rules
Both garden cities have their own consent scheme on top of planning. In Letchworth it's the Heritage Foundation, and in Welwyn Garden City it's the council's Estate Management Scheme. Either can say no to an outdoor unit the planning rules would allow. Here is what each one asks for, what it costs, how long it takes and which positions usually get through.

- Letchworth gap to any boundary
- 1 m
- Letchworth's aim for a decision
- 6 weeks
- Welwyn Garden City EMS decision
- 8 weeks
- Welwyn EMS fee for a heat pump
- Free
On this page15 sections
Two garden cities, two consent schemes
In both towns the estate scheme sits on top of planning. You need the planning answer and the estate's written consent, in that order, before anything goes on the wall.
- Letchworth was the world's first garden city, begun in 1903. Welwyn Garden City was the second, laid out to Louis de Soissons' 1920 master plan
- When the Leasehold Reform Act 1967 let leaseholders buy their freeholds, both towns kept control of how houses look through estate schemes
- Letchworth's is run by the Heritage Foundation. Welwyn Garden City's Estate Management Scheme was set up in 1973 and is run by Welwyn Hatfield Borough Council
- A system that heats and cools is an air-to-air heat pump, and on many houses it needs no planning application under Class G, as our planning permission guide explains
- That doesn't touch the estate's consent
- Both schemes are friendlier to heat pumps than to air conditioning: Letchworth's guidance is written for air source heat pumps, and Welwyn Garden City puts them in its free fee band
- So describe the system for what it is: a heat pump that heats the house in winter and can cool it in summer
Letchworth: the Heritage Foundation's Scheme of Management
In the Foundation's words, most dwellings need its written approval before any external changes are made, and that is separate from any permission from the council.
- The Scheme of Management was made under the Leasehold Reform Act 1967
- Clause 6 says an owner shall not carry out any alteration materially affecting the external appearance of the property without the written consent of the Corporation, now the Heritage Foundation
- The work must also follow plans and drawings it has approved first. The same clause says consent shall not be unreasonably withheld
- Its July 2026 form for external alterations names air conditioning units and air source heat pumps as works needing consent
- The scheme covers freehold premises on the estate, shops and offices as well as homes, and many leases carry similar terms
Letchworth's heat pump design principles
From the Foundation's Design Principles: Air Source Heat Pumps Guidance, published June 2025, for both its Heritage and Modern Character Areas. It says units will usually be approved if they follow these:
- Sited at the rear of the property, or possibly at the side where adequate screening from the street is already in place
- Preferably mounted on the ground rather than on a wall
- At least 1 metre from any boundary, a rule national planning law dropped in May 2025 but the Foundation keeps
- External condensers, pipework and air conditioning units discreet and not visible from the street
- Ideally one unit: the Foundation discourages more than one heat pump at a property
- Placed to keep the visual and noise impact low for you, your neighbours and the street
- Not detracting from the character of the house
What Letchworth wants to see
The Foundation's form asks for plans and elevations drawn to scale, with external dimensions including height and a scale bar, readable at A3.
- Elevations and floor plans go at 1:50 or 1:100
- The site plan, at 1:500 or 1:200, shows the neighbouring properties, trees and hedges, which is where your 1 metre boundary gap is proved
- For pipework it wants the size, colour, type and materials
- For small fixtures it accepts marked photos showing the fixing position, or a drawing to scale
- The guidance doesn't ask for a noise report, but it does ask you to keep noise impact low
- Give the Foundation the maker's sound data for the outdoor unit and its distance to the nearest neighbouring window
- A multi-split, with one outdoor unit serving two to four rooms, is the usual answer to the one-unit rule
How a Letchworth application runs
Free pre-application advice
The Foundation's Heritage and Stewardship Team gives free advice before you apply, at home@letchworth.com or 01462 530335. Send photos of the position you have in mind.
Apply through the portal
Formal applications go through portal.letchworth.com, and each gets a case officer. There's no charge if you apply before any work is done.
A decision in about six weeks
The Foundation aims to decide within six weeks of registration. Asking for more information, or referring the case to a committee or the Board of Trustees, which meets every four weeks, can take longer.
Review if refused
A refusal can be reviewed by the Advisory Management Committee, which visits the site, and then decided by the Householders Applications Committee, which meets on the third Friday of each month.
Appeal to an Independent Inspector
If it's still refused, you can appeal within 12 weeks of the final decision letter to an Independent Inspector nominated by RIBA. The £550 fee is split equally between you and the Foundation, and the decision binds the Foundation.
Welwyn Garden City: the Estate Management Scheme
Welwyn Hatfield Borough Council runs the Estate Management Scheme, which covers most of Welwyn Garden City, and says it is the council's responsibility to grant or refuse consent.
- If you live in the scheme you may need consent before changing your home or garden, separately from planning permission, even though the same council decides both
- Its online map shows whether your address is in the scheme
- Only owners or tenants can apply, online through the scheme's website
- Free pre-application advice is offered only to prospective residents and tenants who can show a genuine interest in a property, within up to 30 working days
- Decisions follow the planning timescale: eight weeks from receipt of a valid application and fee
What Welwyn's design guide says about air conditioning
The scheme's design guide has its own page, Air Conditioning and External Boiler Units, under policy EM1. It is the only dedicated air conditioning rule we've found near Luton.
- Units must be carefully positioned where they are not visible to the street or neighbouring gardens
- Where the position is restricted, suitable screening should be considered and pipe runs should have minimal visual impact
- Units should avoid unnecessary impact on neighbours from noise
- A 2025 officer report said heat pumps allowed in the scheme have typically been at the rear and low down
- At 162 Daniells, a unit at the front of a garage was refused on 18 March 2025 as readily visible from the street and an incongruous addition
- At 118 Handside Lane in 2022, the council refused a front heat pump and said the heat pump, and its screening, would be incongruous. Screening did not rescue a front position
- The same 2025 report criticised the application for not giving the heat pump's dimensions, so dimension the unit on every drawing
- The guide says new soil and downpipes should be avoided on the front of garden city homes, so plan the refrigerant pipe inside the house or on a rear wall
What Welwyn wants in the application, and the fees
The fee structure, updated 1 April 2026, puts air source heat pumps in Environmental Projects, which is free.
- The validation list asks for: an application statement explaining the background and reasons for the work, a location plan and a site plan
- Also existing and proposed elevations and floor plans at a scale such as 1:50 or 1:100, roof plans where the roof changes, and a method statement if requested
- Air conditioning isn't named in any fee band, and small projects at £88 include external pipe works and external boilers, so ask which band your system falls in before you pay
- A retrospective application costs £281
- There is no appeal on the merits. After a refusal you can discuss an amended scheme with the Estate Management team and resubmit
- Or ask for a review by the council's Executive Director (Place) within 3 months, which checks only that the right process was followed
Letchworth and Welwyn Garden City side by side
| Question | Letchworth | Welwyn Garden City |
|---|---|---|
| Who decides | Letchworth Garden City Heritage Foundation | Welwyn Hatfield Borough Council, separately from planning |
| Where the unit should go | Rear, or a side already screened from the street | Not visible to the street or neighbouring gardens; typically rear and low level |
| On the ground or the wall | Preferably on the ground | Low level; no rule on ground or wall found |
| Distance from boundaries | At least 1 metre | No set distance found |
| How many units | More than one heat pump discouraged | No limit found |
| Front positions | Not visible from the street | Refused, even with screening (2022 and 2025 decisions) |
| Fee before the work | None | Free for air source heat pumps; ask which band applies |
| Fee after the work | £216 for up to 3 alterations | £281 |
| Decision time | Aims for 6 weeks | 8 weeks from a valid application |
| Pre-application advice | Free, from the Heritage and Stewardship Team | Free only for prospective residents and tenants |
| If refused | Review, then an Independent Inspector within 12 weeks (£550, shared) | Resubmit, or a process review within 3 months |
From each scheme's published guidance and fee pages, read October 2026.
Planning permission on top: North Herts and Welwyn Hatfield
The council's side follows the national rules. A heating-capable unit on a house is often permitted development if it isn't cooling-only, is no bigger than 1.5 m³ and passes the MCS 020(a) noise check of 37 dB(A) at neighbours' windows.
- A semi-detached or terraced house can have one
- A cooling-only unit, a listed building or a unit on a wall or roof facing a road in a conservation area needs a planning application
- Letchworth: North Herts Council handles planning. The Letchworth conservation area, designated in 1974 and amended in 1990, holds 78 listed building entries in the national dataset
- Norton, Croft Lane and Willian are conservation areas too. In October 2026 the council's conservation area Article 4 directions covered Hitchin and Stockens Green, not Letchworth
- Welwyn Garden City: Welwyn Hatfield handles planning. The town has three conservation areas: the town centre and the residential areas to its west, the Beehive area and Peartree
- The council's Welwyn village conservation area appraisal says air conditioning units in prominent locations could be intrusive
- Both councils are due to be replaced by a new Central Hertfordshire council on 1 April 2028, subject to Parliament
A position that suits both schemes
What we look for at the survey in either town. A unit that ticks these usually suits the estate and the planning rules at the same time.
- At the rear of the house, or a side already hidden from the street by a wall, gate or hedge
- On a ground pad or low frame with anti-vibration feet, not high on a wall
- At least 1 metre from every boundary in Letchworth, and away from neighbours' windows in both towns
- One outdoor unit for the whole system, with a multi-split if you want more than one room
- Not visible from the street or from neighbouring gardens, with planting or a timber screen if the spot is tight
- Pipes routed inside the house, or kept short on a rear wall, never on the front
- Condensate to a drain or a gravel soakaway at the base of the unit
- Exact unit dimensions, colour and the maker's sound data written on the drawings
How we help in both towns
We're based in Luton, so both towns are close to us. At the free survey we check your address against the scheme maps, conservation areas and listing, find a position that meets the guidance, and give you the model, size and sound data.
- Ask the Foundation or the Estate Management team early what they want to see for your unit
- Letchworth's form accepts marked photos for some small fixtures, but asks for scaled plans and elevations for most changes
- Where the estate or the council wants scaled plans and elevations, that is what our design pack is for
- It covers a measured survey, location and site plans, existing and proposed drawings, the unit, pipe and condensate routes, any screen, the equipment schedule and our MCS 020 sound calculation
- It's from £795, a fixed fee agreed in writing, paid in full when you accept, and payable whether or not consent is granted
- If you accept our installation quote within 6 months of receiving it, the full fee comes off the installation
What it costs in Letchworth and Welwyn Garden City
Our starting prices are the same here as across Hertfordshire. Every installation price is fixed in writing after a free survey; estate and planning fees are separate.
- from£1,850
A bedroom or study
2.5 kW wall unit, 5 m pipe, fitted in a day
- from£2,050
A living room
3.5 kW wall unit
- from£3,650
Two rooms, one outdoor unit
Multi-split
- from£5,100
Three rooms
Multi-split
- from£795
A design pack for a consent application
Drawings, specification and sound data; taken off the install if you go ahead
Garden city questions
Do I need Letchworth Heritage Foundation consent for air conditioning?
Very likely. The Foundation says most homes in the Garden City need its written approval before any external change, and its form names air conditioning units and air source heat pumps. That is separate from planning, so a unit can be permitted development and still need the Foundation's consent. Applying before the work is free.
Where can an air conditioning unit go in Letchworth?
At the rear, or at a side already screened from the street, preferably on the ground and at least 1 metre from any boundary, according to the Foundation's June 2025 design principles. It must not be visible from the street, and the Foundation discourages more than one unit, so a multi-split serving several rooms from one outdoor unit is the usual way to cool or heat more than one room.
Does the Welwyn Garden City Estate Management Scheme allow air conditioning?
Yes, where the unit is out of view from the street and neighbouring gardens. Its design guide has a page on air conditioning units asking for careful positioning, screening where the position is restricted, minimal pipe runs and no unnecessary noise for neighbours. Units at the front have been refused, even with screening.
What does an Estate Management application cost in Welwyn Garden City?
Air source heat pumps are in the Environmental Projects band, which is free, under the fee structure updated 1 April 2026. Air conditioning isn't named in any band, so ask the Estate Management team which applies before paying. Small projects cost £88 and a retrospective application £281, so apply before the work.
How long does Letchworth Heritage Foundation consent take?
The Foundation aims to decide within six weeks of registering the application. It can take longer if it asks for more information or refers the case to a committee or to the Board of Trustees, which meets every four weeks. Free pre-application advice first usually makes the formal stage quicker.
Can I put a heat pump on the front of my house in Welwyn Garden City?
It's very unlikely to be approved. The council refused a heat pump at the front of a garage at 162 Daniells in March 2025 as readily visible from the street, and at 118 Handside Lane in 2022 it refused a front heat pump with its screening. In a conservation area a unit on a wall facing the road also needs planning permission.
Do I still need planning permission if the estate says yes?
Sometimes. The estate's consent and planning are separate. A heating-capable unit on a house is often permitted development if it meets the size, position and noise rules. A cooling-only unit, a listed building, a flat or a unit facing the road in a conservation area needs an application to North Herts or Welwyn Hatfield. Our planning checker looks up your postcode.
What if Letchworth refuses my application?
Ask for a review by the Advisory Management Committee, which visits the site, followed by a decision from the Householders Applications Committee. If it's still refused, you can appeal within 12 weeks of the final decision letter to an Independent Inspector nominated by RIBA. The £550 fee is split equally and the decision binds the Foundation.
Do I need the design pack for a garden city application?
Not always. Ask the estate at the pre-application stage what it wants for your unit. Letchworth's form accepts marked photos or a scaled drawing for some small fixtures, and we give you the product details and sound data after the free survey. Where scaled plans, elevations and a site plan are asked for, or a planning application is needed too, the design pack provides them.