Skip to content

Air conditioning on a new build: covenants and removed permitted development rights

New-build homes are usually the easiest to fit with air conditioning. The checks are paperwork, and there are two of them that people often mix up: covenants in your deeds, enforced by the developer, a management company or neighbours, and planning conditions on the estate's permission, enforced by the council. Here's how to find both, read them, and get a yes if you need one.

online copy of your title register £7

Outdoor unit on a low ground stand on the side wall of a new-build brick house, beside a fresh lawn and new fence
online copy of your title register
£7
householder planning fee, April 2026
£548
covenants and planning conditions
Two checks
for the council to decide
8 weeks
On this page15 sections

Two different controls, often confused

A covenant is a private promise in your title. A planning condition is the council's rule on your estate's permission. They work separately.

  • Covenant: usually in the transfer from the developer, and it binds you as owner
  • Whoever has the benefit of it, often the developer, an estate management company or the neighbouring owners, can enforce it in the courts
  • The council doesn't check covenants and can't waive them
  • Planning condition: attached by the council to the planning permission for your estate
  • One that removes permitted development rights means work that would normally need no application now needs one
  • The council enforces it, and a covenant consent from the developer doesn't override it
  • On top of both sit the normal planning rules for heat pumps, covered in our planning permission guide
  • For a new-build flat, the lease and the freeholder's consent apply as well
  • Our guide to why new builds get so hot covers whether air conditioning is the right fix in the first place

Covenant, condition or estate rule?

ControlWhere you find itWho enforces itHow you get a yes
Restrictive covenantThe charges register of your title, and the transfer it refers toWhoever has the benefit: developer, management company or neighboursWritten consent from whoever the covenant names
Planning condition removing permitted developmentThe decision notice for the estate or your phase, on the council's planning registerThe councilA planning application, or an application to change the condition
Estate rules or design codeYour transfer, the management company's documents or the estate's codeThe management company or estate ownerIts own consent process
Article 4 directionThe council's list of directionsThe councilA planning application
Lease, for a flat or leasehold houseThe alterations clause of your leaseThe freeholder or managing agentA licence for alterations

Do new builds have permitted development rights?

Yes, by default. The permitted development rules apply to a new house just as they do to an old one.

  • That includes Class G, which lets a heating-capable heat pump go on a house without an application if it meets the size, position and noise limits
  • Air conditioning that also heats counts. Cooling-only units never have the right, new build or not
  • The exception is a condition: Article 3(4) of the General Permitted Development Order says nothing in the Order permits development contrary to a condition on a planning permission
  • So if your estate's permission removed some rights by condition, those rights are gone for your home until the condition is changed
  • The government's planning practice guidance says conditions restricting future permitted development rights may not pass the test of reasonableness or necessity
  • It says their scope needs to be precisely defined by reference to the Order, and blanket removal of rights for small alterations is unlikely to meet the tests
  • Conditions like this still appear on estate permissions, so read the wording rather than assuming either way

Reading the condition: which rights were removed?

Most conditions that remove permitted development name the parts and classes of the Order they cover. Which ones are named decides whether a heat pump is caught.

  • Extensions, loft conversions, porches and outbuildings are in Part 1 of Schedule 2. Heat pumps are in Part 14, Class G
  • Names only Part 1, or classes of Part 1: it doesn't touch a heat pump, and a heating-capable unit that meets Class G can still go in without an application
  • Names Part 14, Class G, or the whole of Schedule 2: it does catch it
  • Worded around results rather than classes, such as controlling any equipment or alteration on the elevations: it can catch it too
  • Older permissions may refer to the 1995 Order, which numbered things differently
  • If the wording leaves any doubt, ask the council, or apply for a Lawful Development Certificate to get its answer in writing
  • Check for later changes: a condition can be varied or removed by a later decision under section 73, and your estate's decision list may show several
  • The condition that counts is the one on the permission your home was actually built under

How to find your estate's planning conditions

  1. Find the right permission

    Search the council's online planning register by your address, street or estate name. Large estates usually have an outline permission and then reserved matters approvals for each phase, so note every reference that covers your plot.

  2. Open the decision notices

    The conditions are listed at the end of each decision notice, with the reason for each. Look for any that mention permitted development, the General Permitted Development Order, Schedule 2 or named classes.

  3. Check for later changes

    Look for section 73 decisions that varied or removed conditions, and for any Article 4 direction on the council's list that covers your area.

  4. Read your own paperwork

    Your conveyancing solicitor's report often summarises the planning position and any conditions they spotted. Ask them if the report isn't to hand.

  5. Ask the council if in doubt

    A Lawful Development Certificate for a proposed development gives a legal answer for your exact unit. Its fee is half the full application fee. Many councils also give paid written advice first.

What the condition says, and what you do

What you findDoes it affect a heat pump?What to do
No condition about permitted developmentNoCheck the Class G limits and the MCS 020 noise calculation
Removes Part 1 rights only, or named Part 1 classesNoClass G still applies; keep a copy of the wording with your records
Removes Part 14, Class G, or all of Schedule 2YesApply for planning permission, or to vary the condition
Controls equipment or alterations on the elevationsProbablyAsk the council, or apply for a Lawful Development Certificate
Wording from the 1995 Order, or unclearUnclearAsk the council for its reading in writing
Article 4 direction covering your streetOnly if it names heat pumpsRead the direction; apply if it covers Class G

If permitted development has been removed

It isn't a ban. It means the council wants to see an application.

  • For a house, that's a householder planning application, £548 in England from 1 April 2026
  • The council normally has 8 weeks to decide it once valid
  • It judges the unit on its merits: where it sits, how it looks from the street and how loud it is at the neighbours' windows
  • A unit at the rear or side, low down and away from bedroom windows, is the kind of proposal councils are used to approving
  • The other route: apply under section 73 to remove or vary the condition itself
  • The practice guidance says the original permission continues whatever the outcome, and the council considers only the condition in question
  • A householder refusal can be appealed within 12 weeks
  • For one outdoor unit, an application for the unit itself is usually simpler, because it shows the council exactly what will be built

New build covenants in your deeds

Your title register on HM Land Registry has three parts, and covenants appear in the charges register. An online copy costs £7 (read October 2026).

  • The register often says covenants are in the transfer to the first buyer, so order that too: it has the full wording and usually a plan
  • On new estates, look for covenants not to alter the outside of the house, or not to fix anything to the outside walls or roof
  • Also covenants not to put up structures in front gardens or on open-plan frontages, and not to cause a nuisance or annoyance to neighbours
  • These usually apply without the written consent of a named company: the developer, an estate management company, or both
  • The wording decides whether an outdoor unit at the back is caught, so read it rather than relying on a summary
  • Consent covenants tend to say whose approval you need, but not how quickly they must reply or what they can charge
  • Ask the named company for its process and fee in writing before you apply
  • Keep the consent with your deeds: a buyer's solicitor will ask for it when you sell

How long do new build covenants last?

A restrictive covenant normally binds the land, and each owner in turn, until it's released or changed, unless the deed itself sets a time limit.

  • Some consent covenants last only while the developer is still building on the estate or owns plots there
  • After that, a management company or nobody takes over the job. The exact words matter, so check them
  • If the company named has been dissolved or never replies, don't treat silence as a yes
  • Ask whether the right has passed to a management company
  • Or take out indemnity insurance on a solicitor's advice
  • For a covenant that is out of date or blocks a reasonable use, apply to the Upper Tribunal (Lands Chamber) under section 84 of the Law of Property Act 1925 to discharge or modify it
  • Insurers can refuse cover once you've contacted whoever has the benefit, so talk to a solicitor before writing to anyone

Estate management companies and design codes

Many new estates have a management company that looks after the roads, open spaces and play areas, paid for through an estate charge. Its rules are set in your transfer, and some estates add a design code saying what can change on the outside of a house.

  • Poundbury: its Design and Community Code says air conditioning systems must not be visible from the street
  • Units there are considered subject to strict control on siting, the effect on neighbours and a requirement to remove them if they cause a nuisance
  • Its stipulations need the Duchy of Cornwall's written approval for exterior alterations
  • Nansledan: any equipment, plant or system on the outside of a home needs prior consent
  • Bournville: some newer streets need Crest Nicholson's approval instead of the Trust's
  • Near us: the new estates at Linmere and Bidwell West in Houghton Regis come with planning conditions, covenants in the deeds and management company rules
  • Those can cover anything fixed to the outside of the house, and the same is true of many newer estates across Bedfordshire and Hertfordshire
  • Our area pages note the local planning position

Checks before you book a survey

Ten minutes now saves a wasted quote. We go through all of this with you at the free survey.

  • Order your title register and the transfer it refers to, and read the covenants in full
  • Note the name of any company whose consent the covenants need, and whether it still exists
  • Find the outline and reserved matters permissions for your phase on the council's planning register
  • Read every condition for anything about permitted development, Schedule 2, Part 14 or Class G
  • Check the council's list of Article 4 directions for your area
  • Ask the management company for its alterations process, fee and any design code
  • Choose a heating-capable system: cooling-only units never have permitted development rights
  • Pick a position at the rear or side, low down, away from your own and your neighbours' bedroom windows
  • Keep the outdoor unit within 1.5 m³ and the noise at neighbours' windows within the MCS 020 limit
  • For a flat, read the lease and ask the freeholder first: the rules are different
  • Keep every consent and the planning answer with your deeds for when you sell

New-build flats and the developer's warranty

In a new-build flat, the freeholder or management company owns the outside of the building, so the lease and a licence for alterations come first, and a block of flats only gets one heat pump without planning permission. Our freeholder consent guide covers that route step by step.

Warranties are worth a thought too. NHBC's Buildmark excludes alterations you make after its final inspection, so a new hole through the wall is your responsibility, not the builder's. Ask how the hole will be sealed, how the cavity is protected and how the pipe sleeve is finished, and keep the installer's paperwork.

How we help, and where the design pack fits

At the free survey we look at your deeds, the planning conditions and the estate rules with you, and tell you whether you need anyone's consent at all. Often you don't.

  • Where a covenant needs consent, the written quote gives the company what it usually asks for: the model and data sheet, the sound data, and photos marked with the positions and pipe route
  • Where the council has removed permitted development and you need planning permission, it wants scaled drawings
  • Our design pack prepares them: location and block plans, elevations, the unit and its mounting, pipe and drain routes, sound data and an MCS 020 calculation
  • It costs from £795, can be more for the size of the job or the council, and is fixed in writing first
  • It's paid in full when you accept, payable whether or not permission is granted, and includes one round of changes
  • It comes off the installation if you accept our install quote within 6 months

New-build covenant questions

Can I put air conditioning on a new build house?

Usually, yes, and it's often a simple install. Check two things first: the covenants in your deeds, which may need the developer's or management company's consent for anything fixed to the outside, and the planning permission for your estate, which may have removed permitted development rights by condition. Neither stops a well-placed unit, but each may need a yes in writing.

Do new builds have permitted development rights?

Yes, unless a condition on the estate's planning permission removed them. Some conditions remove only the Part 1 rights for extensions and outbuildings, which don't affect heat pumps in Part 14, Class G. Read the decision notice for your phase on the council's planning register, and ask the council or apply for a Lawful Development Certificate if the wording is unclear.

What does permitted development rights removed mean?

It means work that would normally need no planning application now needs one, because a condition on the planning permission for your home says so. Article 3(4) of the General Permitted Development Order stops permitted development overriding a condition. You can still apply for planning permission for the work, or apply to vary the condition.

Where do I find my new build covenants?

In the charges register of your title at HM Land Registry, where an online copy costs £7 (read October 2026). The register often refers to the transfer from the developer for the full wording, so order that document as well. Your conveyancing solicitor's report should also summarise them.

How long do new build covenants last?

A restrictive covenant usually binds every owner of the land until it's released or changed, unless the deed sets a time limit. Some consent covenants only last while the developer is still building on the estate. If the company named no longer exists, take a solicitor's advice before contacting anyone: indemnity insurance and an Upper Tribunal application under section 84 of the Law of Property Act 1925 are the usual routes.

Who enforces a covenant on a new estate?

Whoever has the benefit of it, which the deed names: often the developer while it still owns land on the estate, an estate management company, or sometimes neighbouring owners. The council doesn't enforce covenants, and a council permission doesn't release you from one.

Does the management company's consent mean I don't need planning permission?

No. They're separate. The management company or developer consents under your deeds, and the council decides planning. If a condition removed permitted development, you need both. If it didn't, a heating-capable unit that meets every Class G limit needs no planning application, but you may still need the covenant consent.