How long does air conditioning installation take?

A single wall-mounted unit usually takes 4 to 8 hours, so one room is done in a day. A multi-split for two to four rooms takes 1 to 3 days, and a ducted system for a whole house 3 to 5 days or more. The wait before install day, for a survey and any consents, often takes longer than the fitting itself.

Engineer on a stepladder fitting a white wall unit high on a bright UK living-room wall, its pipes going into the wall behind it
one wall unit, start to finish
4–8 hours
multi-split, two to four rooms
1–3 days
ducted, whole house
3–5 days or more
before any date is booked
Free survey

How long each type of installation takes

Time on site for a standard install in a home, from arriving to handing over. Your survey confirms the time for your job.

SystemUsually fitsTime on site
Wall-mounted splitOne bedroom, study or living room4–8 hours, one day
Floor-standing consoleA loft with sloping ceilings, or under a window4–8 hours, one day
Multi-splitTwo to four rooms on one outdoor unit1–3 days
DuctedOnly slim grilles show in the rooms3–5 days or more for a whole house
Commercial wall unit or cassetteOffices, shops and meeting roomsConfirmed at the survey

A ducted system is often fitted alongside building work, so the timing follows the build programme.

Why one room takes a day

Most of a single-room install is careful work that can't be rushed: drilling the wall, mounting two units level and secure, making the refrigerant joints, then proving the system is sealed and dry before any refrigerant goes round it, and checking it in cooling and heating.

The quickest installs are back to back, with the outdoor unit on the other side of the wall from the indoor unit. Every extra metre of pipe, every floor it has to pass and every awkward height adds time.

What happens on installation day

  1. Arrive and protect the room

    We confirm the positions with you, put dust sheets down and move anything delicate out of the way.

  2. Fix the wall plate and drill

    The indoor unit's mounting plate goes up level. Then one neat hole through the wall behind it, usually about 65 mm across and sloping slightly down to the outside, as Daikin's and Mitsubishi Electric's installation drawings show.

  3. Mount the indoor unit

    The pipes, cable and drain go straight through the wall behind the unit, so nothing runs across your inside wall. The unit then hooks onto the plate.

  4. Fit the outdoor unit

    On a wall bracket or a ground stand, on anti-vibration mounts. Outside, the pipes run in neat white trunking to the outdoor unit.

  5. Connect, pressure test and vacuum

    We make the refrigerant joints, pressure test them with nitrogen to prove there are no leaks, then pull a deep vacuum to clear air and moisture before the refrigerant is released.

  6. Commission

    The power goes on. We check pressures, temperatures and airflow in cooling and in heating, and record the refrigerant in the system.

  7. Hand over

    We show you the remote, the app, the timers and how to clean the filters, register the manufacturer warranty for you and clear up before we leave.

What makes installation take longer

None of these is unusual. We spot them at the survey, so the time and the price are right on your quote.

  • A long pipe run: the outdoor unit can't go straight through the wall from the indoor unit, so the pipes travel further or pass through floors
  • Height: an outdoor unit or pipe route high on the building may need an access tower put up first
  • A new electrical circuit, when there's no suitable spur nearby or the system is larger
  • A condensate pump, when the water can't drain away by gravity
  • Removing an old system first, with its refrigerant recovered legally
  • Flats: carrying kit up stairs, reaching a rear wall or roof, and any working rules your building sets
  • Several rooms: each extra indoor unit on a multi-split adds its own hole, pipe run and testing

Electrics and Part P

Most single rooms connect to a suitable existing fused spur, which adds little time. A larger system, or a home with no suitable spur, may need a new circuit from the consumer unit.

In England, installing a new circuit in a home is notifiable work under Part P of the Building Regulations (regulation 12(6A) of the Building Regulations 2010). It must be certified by an electrician registered with a competent person scheme, or approved by building control. That's why it shows as its own line on a quote, and why we check your electrics at the survey.

Lead times: from first enquiry to install day

The install is often the quickest part. Before it come the survey, your written quote and any consent the job needs. Our quotes stay valid for 30 days, so you have time to decide.

Homeowners who agree a contract at home or at a distance have 14 days to cancel under the Consumer Contracts Regulations 2013. We only start inside those 14 days if you ask us to in writing, so the earliest date usually falls after them.

Consents add the most time. A leasehold flat usually needs the freeholder's written consent, and managing agents can take weeks to reply. If a unit falls outside permitted development, councils normally have 8 weeks to decide a householder planning application, and 8 weeks for a Lawful Development Certificate. If you want cooling for summer, start in spring.

How to get ready for install day

  • Clear the wall where the indoor unit goes, and the floor beneath it
  • Make sure we can reach the outdoor position: garden gate unlocked, side passage clear, bins moved
  • Tell us about any water pipes or cables hidden in the wall we'll be drilling
  • Have the freeholder's or landlord's written consent ready, if you need it
  • Sort parking: in a controlled parking zone, a visitor permit or bay suspension may be needed
  • Keep pets and children out of the room while we drill and test
  • Have your Wi-Fi name and password to hand if you want app control set up
  • Be home at the start to confirm positions, and at the end for the handover

What a one-day install costs

Starting prices for the systems most homes have fitted in a day or two. Home prices include VAT. Our cost guide covers the rest.

  • A bedroom or study

    2.5 kW wall unit, 5 m pipe, fitted in a day

    from£1,850inc. VAT
  • A living room

    3.5 kW wall unit

    from£2,050inc. VAT
  • Open plan or a loft

    5 kW wall unit

    from£2,450inc. VAT
  • Floor-standing unit

    2.5 kW console

    from£2,350inc. VAT
  • Two rooms, one outdoor unit

    Multi-split

    from£3,650inc. VAT

Installation time questions

How long does it take to install air conditioning in one room?

Usually 4 to 8 hours for a wall-mounted split, so one room is fitted in a day. A back-to-back install, with the outdoor unit straight through the wall, is at the quick end. A long pipe run, a high outdoor position or a new circuit pushes it towards a full day.

How long does a multi-split installation take?

1 to 3 days for two to four rooms on one outdoor unit. Each indoor unit has its own hole, pipe run and connection to the outdoor unit, and the whole system is pressure tested, vacuumed and commissioned together.

How many hours does it take to install an air conditioner?

4 to 8 hours for a single wall unit or floor console. Ducted systems take 3 to 5 days or more for a whole house, often alongside building work.

Can I use the air conditioning straight away?

Yes. Once we've commissioned it and shown you the controls, it's ready to use the same day. Commissioning checks the system in cooling and heating, so you can see both working before we leave.

Do I need to be at home during the installation?

Someone needs to be there at the start, to confirm where the units go and let us in, and at the end for the handover. In between you're welcome to carry on with your day, as long as we can reach the room and the outdoor position.

Can air conditioning be installed in winter?

Yes. Installs happen all year, and every home system we fit heats as well as cools, so a winter install keeps a room warm now and cool next summer. Autumn and winter are also a good time to get consents sorted before the warm weather.

How much mess does it make?

Not much. We drill one hole per indoor unit under dust sheets, extract the dust as we go and clean up before we leave. The pipes go straight through the wall behind the unit, with neat trunking outside only.